Indoor door purchase knowledge points

(1) Generally speaking, the price of a door refers to the price of a door with a cover, but does not include hardware, and the merchants who mold the door often claim to include hardware, not because they are generous, but because the molded door cannot be on site. To slot, the hardware must be pre-installed. Merchants who sell molds do not tell so much to their classmates, but often use "including hardware" as a sign of sales to attract unsuspecting students. There are also some so-called "special design" doors that also use matching door locks and hinges, such as Holtzmen, which gives a feeling of strong buying and selling, not very cool.

(2) Install the door at the joint between the floor tile and the floor. The floor tile is usually laid a centimeter inside the entry hole, so that the floor bead will be pressed under the door in the future, and the inside and outside looks very neat and beautiful. The key to grasping this is the bricklayer. It should be a common sense for responsible bricklayers, but it is hard to say if the quality of the bricklayer is poor. Many students have paid tuition fees at this point. Therefore, I suggest that you should first communicate with the bricklayer on this point before laying the floor tiles.

(3) When selecting the door, in addition to the quality of the door, you should ask about the construction period of the door in order to grasp the progress of the home improvement.

(4) The standard door hole has a standard size range. When the master touches the door hole, if it is a door hole within the standard range, he will record the size of the door hole and go back to the size according to the size; if it is not the standard size range, he will generally You have to add the appropriate money (ten, 20); if it is really too much, he will advise you to let the decoration team modify it and give you a certain size. You must pay attention to this size. Let the workers do bad for you.

(5) The wood for the door is generally hard to be deformed with hardwood or synthetic wood. It is not possible to use cork such as white pine.

(6) Generally speaking, the door should be installed first and then the floor should be installed. Because only the door is installed first, the baseboard of the floor can be connected with the tightness of the door line. There are also very few doors that require the floor to be installed first. When the students buy, remember to ask the merchant.

(7) The door is divided into two types: clear oil (with wood grain) and mixed oil (without wood grain).

(8) Legend has it that the molded door has poor resistance to deformation, and students need to consider it when choosing.

(9) The installation of the door is critical. If it is not very busy, it is best for the students to supervise the work when the door is installed.

(10) The hardware of the door is also very important. The good door must be matched with a good door lock, hinge, and door suction (ground suction) to complete.

Document.body.oncopy = function () { setTimeout( function () { var text = clipboardData.getData("text"); if (text) { text = text + " This article comes from China Wooden Door Network, China's well-known wooden door industry portal Website! (http://) Detailed reference: "+location.href; clipboardData.setData("text", text); } }, 100) }

Superior Folding Gazebo

Best Pop Up Gazebo,Pop Up Gazebo Canopy,Commercial Pop Up Gazebo,Waterproof Pop Up Gazebo

HESHAN YUEHAN UMBRELLA MANUFACTURING CO., LTD , https://www.sunplustent.com