Renovation guide: How to do during the design and material preparation phase

When designing homes in the cold winter, people can easily create illusions. Naturally, they like some warm colors because it gives us a warm feeling, but if the whole room is too warm, it will feel hot in summer. Therefore, at the time of renovation, it is necessary to combine the actual conditions of the region and adopt appropriate colors in the appropriate places. And even if you really like very warm colors, you need to have proper adjustments.

In terms of schedule preparation, we must pay attention to the reasonable arrangement of the Spring Festival period, because many decoration workers will return home during this period, and the time will be longer, and should avoid the related problems that may be brought to the decoration.

For newly built houses, the walls and floors are usually damp and cold. It is easy to cause the tiles to be weak during the decoration process or adversely affect the materials such as solid wood floors. Therefore, the room should try to run one-stage heating equipment. Helps the walls and floors dry quickly.

Dry in winter, such weather can easily cause cracks and deformation of plates and wooden keels. The main materials used in the decoration, especially the wood, should be prepared in advance. It is best to place it in the room with heating equipment for three to five days, so that the moisture content of the wood is close to the level inside the house, so as to avoid deformation after the decoration.

When important materials such as veneers are stored in the room, dust should be removed in time, and it is necessary to brush the varnish cover. The decorative panel should be placed flat, moisture-proof and anti-cracking and anti-lifting. The floor should be padded with a straight thick plate. The veneer should be placed neatly, and then a thick plate should be placed on it. The objects thus stored are generally not easily deformed.

For the wood thread used as the edge, because the moisture content is higher than the veneer, the wood wire should be sealed as soon as possible after processing. If the moisture in the wood wire is lost, the wood wire will shrink and may affect The appearance to the veneer.

The moisture content of the wooden keel must be controlled below 12%, and the "keel" must be firm and there should be no looseness, thus preventing cracks in the gypsum board ceiling.

In areas with heating, be careful not to stack the decoration materials too close to the heating equipment such as heating to avoid deformation of various materials caused by uneven heating.

Whether it is a wall tile or a floor tile, the material should be moved from the outside to the indoor storage stage to make it consistent with the indoor temperature, so as to avoid the phenomenon of emptying and falling off after construction.

Five precautions for winter decoration

In response to the climatic characteristics of winter, experts put forward five notes:

First consideration

The main materials used in the decoration, especially the wood, should be prepared in advance, preferably in the room with heating equipment for 3 to 5 days to volatilize the moisture generated by the temperature change, so that the moisture content of the wood is close to the level of the house. In order to avoid deformation after renovation.

Second consideration

The sand should be carefully screened and there should be no ice. The construction personnel should properly add the antifreeze according to the actual construction needs. When the mortar is stirred, the temperature of the water should not exceed 80 °C. The maintenance time should be extended with the use of the bricklayer to extend the curing time of the bricklayer construction for 48 to 72 hours. Cement can not be used in the open air, and it is necessary to prevent freezing.

Third consideration

Putty can't be too thick. Because the indoor air is dry, the water loss is faster, otherwise it will easily cause empty drums, cracks, and wall inequality.

Fourth consideration

In winter, the indoor and outdoor temperature difference is large. Whether it is wall tile or floor tile, it must be adapted to the indoor temperature to be laid, so as to avoid the phenomenon of empty drums and falling off after construction. In addition, the bricks should be carefully attached to the joints in time.

Fifth consideration

When the oil painter sprays various coatings, it should be painted strictly according to the temperature in the product description. The ambient temperature of the coating application should not be lower than 5 °C. The ambient temperature of the commonly used mixed color coating should be above 0 °C, varnish. The ambient temperature during application should not be lower than 8 °C. In winter decoration construction, it is necessary to pay close attention to closing the doors and windows to ensure that the indoor temperature is at least 5 °C, especially for oil workers, pay attention to "warm", and then open the doors and windows after drying. ventilation.

Canvas is a durable material which is also easy to clean and maintain, without losing its qualities.

The canvas we use to make vintage backpacks, handbags or travel bags is carefully treated to be able to carry all your belongings in urban and natural environments without any concern for safety or durability.

We understood a long time ago that our modern world was rapidly changing, permanently searching for ways to adapt, to transform and evolve. This is why our fashion, casual, work, school or travel bags mix form and function in a sophisticated manner.

Canvas Bags

Canvas Bags,Canvas Tote Bags,Small Canvas Bags,Custom Canvas Bags

KAIPING XIN SUI YING LEATHER WARE CO.,LTD , https://www.paliobag.com